lamp.
ResourcesPricingAbout

Design verification

Design verification is the checking, by test, measurement or calculation, that the design output meets each requirement stated in the design input.

What it means

For every requirement in the input, you identify a way to prove it is met: a strength test, a dimension check, a calculation or a comparison with a standard. The results show that the design was done right against what was asked. It happens during development, often on prototypes, and its record becomes evidence that nothing was assumed.

Example

The input for a steel stool says it must carry 120 kg with no permanent deformation. A Moradabad workshop loads a prototype with 150 kg weights for ten minutes and measures the seat before and after. Deflection returns to zero, so this requirement is verified and recorded against the drawing revision.

Records and checks

  • Record each requirement, the method used, the sample, the result and the revision tested.
  • Verify that every input has at least one matching check and that failed items lead to a design change.
  • The designer arranges it; a quality person witnesses or reviews the results.

Common mistakes

  • Testing a prototype built differently from the drawings, so the result proves nothing about the design.
  • Verifying only the easy requirements and leaving hard ones, such as life under repeated load, untested.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →