DFMEA

DFMEA is the abbreviation for design failure mode and effects analysis, a ranked list of ways a design could fail and the actions chosen to reduce those risks.

What it means

The usual layout is a table with columns for function, failure mode, effect, cause, current controls and three ratings: severity, occurrence and detection. Multiplying the three gives a risk priority number, used to decide what to tackle first, though high severity alone can demand action. People often use the term interchangeably with design FMEA, and the content is the same.

Example

A Bengaluru maker of electronic energy meters reviews its enclosure. The failure mode is cracking of a latch, effect is the cover opening and enabling tampering, severity 8. Occurrence 4, detection 6, so the score is 192, the highest in the table. It switches the plastic grade and adds a drop test.

Records and checks

  • Record every row with its ratings, the action, the owner and the re-scored values after action.
  • Verify that the rating scale is defined and used the same way by everyone on the team.
  • The design lead facilitates; quality and manufacturing review, and the head approves the release.

Common mistakes

  • Chasing only the highest numbers and ignoring a low-score item that has a severe safety effect.
  • Leaving the table untouched after launch, so field failures never feed back into the ratings.