DG set
A DG set is a diesel engine coupled to an alternator that produces electricity as backup, or sometimes as prime power, when mains supply fails or is unreliable.
What it means
Many factories, hospitals, malls and shops keep one to ride out power cuts. It is rated in kVA, and the real output in kW is lower once power factor is considered. Running a DG set is expensive compared with grid power, because diesel is costly and the engine needs servicing. It runs best near three quarters of its rating; light loading wastes fuel.
Example
A cold storage in Moradabad runs a 125 kVA DG set for about 30 hours a month during outages, using 480 litres of diesel. The owner logs run hours, litres and units generated each time, to see the real cost.
Records and checks
- Record run hours, diesel filled, units generated, load and service dates in a log book.
- Verify diesel stock by dipstick against the log and check for unaccounted drawings.
- The maintenance in charge reviews the log monthly and the owner compares diesel cost per unit with grid tariff.
Common mistakes
- Running a large set at very low load for a small need.
- Not logging diesel, so theft and leaks go unseen.