lamp.
ResourcesPricingAbout

Die setting

Die setting is the work of mounting a die on a press, aligning it, adjusting shut height and settings, and running trial pieces until the part is within specification.

What it means

A good set-up depends on correct die height, alignment, feed, fixing and stroke. The skilled person doing it is called a die setter. Poor setting causes burrs, uneven parts and damage to the die. Time spent on setting is part of changeover time, and the quality of the first pieces affects scrap and rework for the whole run.

Example

A press shop sets a 25-tonne press for a bracket die. The setter takes 75 minutes, checks the first five pieces against the drawing and approves the run only when all are within tolerance.

Records and checks

  • Record the die number, press, date, setter, settings used, time taken and trial piece results.
  • Verify first pieces against the drawing before releasing the run for production.
  • The die setter does the work; the quality inspector approves the first piece and the supervisor releases production.

Common mistakes

  • Approving the setting by eye without measuring the first pieces.
  • Not saving the settings that worked, so each set-up starts from scratch.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →