Drawing power
Drawing power is the maximum amount a business can actually withdraw from a working-capital limit, based on the value of eligible stock and receivables after the bank's margin.
What it means
The sanctioned limit is the ceiling; drawing power is the live figure beneath it. The bank takes the stock and receivables you report, deducts its margin, and the result, capped at the limit, is what you may use. Stale, disputed or unreported items are usually excluded. The bank asks for periodic stock and debtor statements to refresh it.
Example
A spares dealer has a ₹50 lakh cash credit limit. His statement shows ₹40 lakh of stock and ₹10 lakh of current debtors. With a 25% margin, drawing power is ₹37.5 lakh, so he cannot draw more than that.
Records and checks
- Record each stock and debtor statement submitted, with its date and the margin percentage.
- Verify stock figures against the stock register and check that listed debtors are within the bank's age limit.
- The accountant prepares the statement and the owner signs it.
Common mistakes
- Overstating stock to raise drawing power, which can get the account flagged on inspection.
- Submitting the statement late, so the bank lowers drawing power and cheques bounce.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →