Energy audit
An energy audit is a structured study of how a site uses electricity, fuel and water, to find waste and recommend practical savings with their cost.
What it means
An auditor reviews bills, walks the plant, measures loads with portable meters and compares equipment with how it should perform. The report lists savings opportunities, such as leaks, oversized motors, poor power factor and lighting, with estimated cost, savings and payback. It can be a simple walk through or a detailed study, and is only worth it if findings are acted on.
Example
A plastics unit in Vasai hires an auditor for ₹35,000. The report finds ₹4,80,000 a year of savings from fixing air leaks, replacing two oversized motors and correcting power factor. The owner starts with the cheapest fix.
Records and checks
- Record the audit date, the auditor, findings, estimated savings, owner and completion date for each action.
- Verify savings after each fix from bills or sub meters, not just the auditor's estimate.
- The owner reviews progress quarterly and repeats the audit after major changes.
Common mistakes
- Filing the report without assigning actions to people.
- Counting estimated savings as achieved without any measurement.