lamp.
ResourcesPricingAbout

Expiry date control

Expiry date control is the routine of recording, labelling and checking use-by dates so that ingredients and prepared food are used in time or discarded.

What it means

Dairy, packaged items and opened sauces all have limits. Staff label each item at receipt or preparation, store older stock in front, and follow first expiry, first out. A daily walk-through finds items close to expiry so they can be used first. Serving expired items risks guest illness.

Example

A cafe receives ₹14,000 of milk and cream each week. Each pack is stamped with its receipt date, and the cold room is checked every morning. Two cream packs with one day left are used in that day's desserts, and a spoiled one is logged and discarded.

Records and checks

  • Record the item, batch or receipt date, expiry date, storage location, and any discard with the reason.
  • Verify dates at goods receipt, and again during the daily storage walk-through.
  • The store keeper labels and rotates, and the kitchen head signs off the daily check.

Common mistakes

  • Putting new deliveries in front of older stock, so it expires unnoticed.
  • Not dating opened or prepared items.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →