Extrusion
Extrusion is a process in which melted plastic is pushed through a shaped die to form a continuous product such as film, pipe, sheet or a profile.
What it means
Resin pellets feed into a heated barrel with a rotating screw that melts, mixes and pushes the plastic through a die. The shape of the die decides the product: a ring for a pipe or a blown film, a slot for a sheet. The product then passes through cooling, is pulled at a controlled speed and is cut or wound. Output is measured in kilograms per hour or metres per minute.
Example
A pipe unit extrudes 20 mm PVC conduit at 18 metres a minute. The die gives the wall thickness, the cooling bath sets the shape and the puller controls the speed. Each hour the operator checks the outside diameter and wall thickness with a gauge and cuts a sample length for a weight check.
Records and checks
- Record the material grade, barrel zone temperatures, screw speed, line speed, output rate and the dimensions measured.
- Verify the dimensions, weight per metre and surface finish at fixed intervals during the run.
- The operator logs the readings, the quality inspector verifies the samples, and the supervisor reviews downtime and scrap.
Common mistakes
- Changing the line speed without changing the cooling, so the product comes out out of shape.
- Restarting after a stop without purging, and getting black specks in the product.