Fabric spreading
Fabric spreading is the process of laying fabric in many flat, aligned layers on the cutting table, in the planned length and number of plies, before the marker is placed.
What it means
It can be done by hand or by a spreading machine. Layers must be even, free of tension, with edges aligned and fabric direction and face consistent. Poor spreading causes distorted pieces, uneven sizes and wasted fabric at ends. Defects are marked or cut out as the fabric goes down, and splices are noted on the ticket.
Example
For a 70-ply lay of 8 metres in a Tiruppur factory, the spreader finds one roll with a splice and two plies with holes. Both are marked, and the shortfall of three plies is noted on the cutting ticket.
Records and checks
- Record the number of plies, lay length, rolls used and splices.
- Verify edge alignment and tension before the marker is placed.
- The spreader and cutting supervisor check each lay before cutting.
Common mistakes
- Spreading with tension in knit fabric, which relaxes and shrinks later.
- Mixing the face and back of fabric in the same lay.