Fabrication drawing

A fabrication drawing is a technical drawing that gives the dimensions, materials, joints, welding details and tolerances needed to make and assemble a metal item.

What it means

It is the document the shop floor works from. A good one has a title block, revision number, material and thickness callouts, part marks, a parts list, weld symbols, hole details and finish notes.

Example

A buyer orders a 2 metre equipment skid. The fabricator issues a drawing at revision B showing 100 x 50 channels, 12 mm base plates, fillet welds all round and a paint specification. The customer's approval is recorded before the first cutting is released.

Records and checks

  • Record the drawing number, revision, date, approver and the job and parts it applies to.
  • Verify that the shop is working from the latest approved revision and that old copies are removed from the floor.
  • The design engineer issues it, the customer approves it where required, and the quality head audits the revision control.

Common mistakes

  • Letting older revisions stay in circulation, so one team builds to superseded dimensions.
  • Starting cutting before the customer's approval, then facing costly changes.