Fabric width

Fabric width is the measured width of the cloth across the roll, and its cuttable width is the usable part between selvedges or edges, which decides marker width.

What it means

The quoted width and the cuttable width are not the same, and the mill's quote may be wider than the usable cloth. A marker is made to fit the cuttable width, so a 2 cm drop in width can force a longer marker and more fabric per garment. Width is checked at several points along the roll since it can vary.

Example

A fabric purchased as 58 inches is found to have only 56 inches cuttable. The marker for a kurta, planned at 2.40 metres, becomes 2.50 metres, adding 4 percent to fabric use on 3,000 pieces.

Records and checks

  • Record the quoted width, cuttable width and test points for each roll.
  • Verify width at the start, middle and end of the roll.
  • Quality measures on receipt; the planner uses the cuttable width.

Common mistakes

  • Costing from the quoted width and not the cuttable width.
  • Measuring only at the roll end, where width may differ from the middle.