Film thickness
Film thickness is the measured depth of a plastic film, usually given in microns, which affects its strength, clarity, weight and cost per square metre.
What it means
Plastic film is sold by thickness, width and length, and the buyer often pays by weight. Thickness varies across the width and along the length, so it is measured at several points. Too thin gives tears and short life, while too thick wastes resin. The tolerance is agreed with the buyer, and the gauge reading is used with the width to work out the weight of a roll.
Example
A packaging firm supplies 40-micron LDPE film for a dairy that allows plus or minus 10 percent. The operator measures five points across the width each hour. Readings of 38, 41, 44, 40 and 36 microns show one edge at 36, under the 36-micron limit, so the die gap is adjusted before the roll is accepted.
Records and checks
- Record the readings at each point across the width, the time, the roll number and the gauge used.
- Verify the average and the lowest reading against the order, and calibrate the gauge on a schedule.
- The operator measures, the quality inspector checks rolls before dispatch, and the supervisor reviews drift.
Common mistakes
- Measuring one spot and assuming the entire width is the same.
- Running thicker than needed as a safety margin, which quietly eats margin on every roll.