Fire exit
A fire exit is a marked, unobstructed door and route that lets people leave a building quickly and safely during a fire, without having to pass through danger.
What it means
During a fire, people need a way out that is easy to see and always open. A fire exit should be marked with a sign, clear of stock and equipment on both sides, open freely in the direction of escape and lead to a safe outdoor area.
Example
A showroom stores cartons beside its rear door. A monthly check finds the door padlocked from inside, so the manager removes the lock and cartons and fixes an exit sign.
Records and checks
- Record the exit locations, the date of each inspection, any obstruction found and when it was cleared.
- Verify that the doors open fully without a key, signs are lit or visible and the path outside is clear.
- The safety coordinator inspects weekly, and the owner reviews any repeated blockage.
Common mistakes
- Locking an exit at night to prevent theft and leaving the key with one person.
- Putting stock in front of the door because it is "only for a few days".
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →