lamp.
ResourcesPricingAbout

Fire risk assessment

A fire risk assessment is a structured review of a premises that identifies what can start or spread a fire, who is at risk, and what controls are needed.

What it means

It looks at ignition sources such as wiring, heaters, welding and cigarettes, at fuel such as packaging, paper, oil and chemicals, and at how people would escape. It then judges how likely and how serious a fire would be and lists actions: better housekeeping, repaired wiring, extinguishers, alarms, clear exits and training. Repeat it after any change in layout or stock.

Example

A paper converter finds waste paper piled beside a motor and an overloaded extension board. The owner orders daily clearing and replaces the board within a week for ₹3,000.

Records and checks

  • Record the date, assessor, hazards, people at risk, actions with owners and dates, and the next review.
  • Verify each action was done and the premises still match the assessment.
  • The safety officer prepares it, and the owner approves it and checks that actions are closed.

Common mistakes

  • Doing it once as paperwork and never updating it.
  • Listing hazards but assigning no owner or date, so nothing is fixed.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →