lamp.
ResourcesPricingAbout

Fire extinguisher inspection

A fire extinguisher inspection is a routine check that each extinguisher is in place, accessible, correct for the risk, undamaged and charged, with a record of the check.

What it means

An extinguisher that fails when needed is worse than none because people rely on it. A simple monthly walk checks location, signage, pressure gauge in the green band, intact seal and pin, no corrosion or dents and a readable label. Types differ by fire: water, foam, dry powder and carbon dioxide suit different fuels, and using the wrong one can make a fire worse.

Example

A fabrication unit has twelve dry powder extinguishers. A supervisor's monthly round finds one with its gauge in the red and another hidden behind a drum. The first is sent for refilling and the second is moved to a marked wall spot.

Records and checks

  • Record the extinguisher number, location, type, inspection date, condition, refill due date and inspector's name.
  • Verify the gauge reading, seal, pin, hose and the date on the service tag against the register.
  • The safety coordinator inspects monthly, and the owner reviews overdue refills.

Common mistakes

  • Placing a water type extinguisher beside electrical panels or a flammable liquid store.
  • Leaving a service tag with an old date.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →