First article inspection
First article inspection is a complete, documented measurement of the first part made from a new drawing, tool or process, compared with every requirement before volume production.
What it means
It proves the process can make the part to specification before hundreds are made. Every dimension, material, finish and marking on the drawing is checked and recorded, often in a customer-approved report. It is repeated after a major change, such as a new tool, a revised drawing or a long gap in production. It is broader than a quick first piece check.
Example
A machine shop wins an order for 2,000 aluminium brackets. The quality team measures all 14 drawing dimensions on the first bracket, records them in a report and sends it to the customer. Production starts after written approval.
Records and checks
- Record the drawing revision, each measured value, the gauges used, the date and the inspector's name.
- Verify that gauges are in calibration and that the report covers every drawing characteristic.
- The quality head signs; the customer approves where the contract requires it.
Common mistakes
- Inspecting against an old drawing revision, so a correct part is rejected or a wrong one passes.
- Checking only dimensions that look critical and missing notes on finish or material.