Fishbone diagram
A fishbone diagram is a drawing with the problem at the head and possible causes grouped on branches, used to organise a team's thinking about why a problem occurs.
What it means
You write the problem in a box on the right and draw a line leading to it. Branches carry the main categories, commonly machine, method, material, manpower, measurement and environment. The team adds possible causes under each. It gives a complete list to investigate, but it only lists possibilities; the real cause still has to be confirmed by checking facts.
Example
A bottling unit sees loose caps. The team lists a worn capping head under machine, an inconsistent torque setting under method, undersized caps from a supplier under material, and a torque gauge out of calibration under measurement. They test each and find the capping head spring weak.
Records and checks
- Record the problem statement, each suspected cause and the check used on it.
- Verify the likely causes with data or a trial, not opinion.
- The quality head leads the session, and operators and supervisors take part.
Common mistakes
- Treating the filled-in diagram as the answer instead of the start of verification.
- Holding the session without the people who actually run the machine.