lamp.
ResourcesPricingAbout

Garment BOM

A garment BOM is the bill of materials for a style, listing every fabric, trim, thread, label and packing item with its quantity per garment.

What it means

It breaks a garment into its parts: shell fabric, lining, interlining, zips, buttons, labels, thread, hangers, polybags and cartons. Each line carries the specification, supplier, unit, quantity per piece and wastage allowance. It is multiplied by the order quantity and colourway split to give purchase needs. Any change in style changes the BOM.

Example

A jacket's BOM shows 1.9 metres of shell, 1.6 metres of lining, one zip of 70 cm, 6 buttons and 1 label. For 1,500 jackets with 3 percent wastage, purchase raises 2,935 metres of shell fabric.

Records and checks

  • Record item, specification, supplier, unit, quantity per piece, wastage and colourway.
  • Verify against the approved sample and the buyer's tech pack.
  • Merchandising prepares it; costing and stores check it before purchase.

Common mistakes

  • Leaving out small items such as tags and packing materials.
  • Not revising the BOM when the buyer changes a trim.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →