lamp.
ResourcesPricingAbout

Gate mark

A gate mark is the small blemish or stub left on a moulded part at the point where molten plastic entered the cavity through the gate.

What it means

Every injection-moulded part has a gate, the narrow opening through which plastic flows into the cavity. When the runner is cut or breaks away, a mark remains. Its size, height and finish depend on the gate type, such as pin, edge or tunnel gate. Buyers of visible items specify where the mark may sit and how flush it must be, since a raised stub can scratch or prevent assembly.

Example

A buyer of cosmetic jar lids rejects a lot because the gate marks sit on the top face and stand 0.5 mm proud. The moulder moves the gate to the inner rim in the next mould revision, and the mark is no longer visible when the lid is closed.

Records and checks

  • Record the gate type, its location on the drawing, the allowed height of the mark and the mould it belongs to.
  • Verify the mark on first article and sample parts against an approved limit sample.
  • The tool room confirms the gate at mould approval, the quality inspector checks parts, and the buyer signs the first sample.

Common mistakes

  • Trimming gate stubs unevenly by hand, which leaves different finishes in one lot.
  • Agreeing the product design without deciding where the gate will leave its mark.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →