Generator efficiency
Generator efficiency is how well a generator turns fuel energy into electricity, usually shown as units of power produced per litre of fuel burned.
What it means
A diesel set commonly delivers around three units, or kWh, per litre when it is well loaded and well maintained. A lower figure means fuel is being wasted by light loading, worn injectors, dirty air filters or poor tuning. To find it, divide the units from a generator meter by the litres used in the same period. Tracking it month to month shows when a service is due.
Example
A hotel in Mount Abu burned 600 litres in a month and produced 1,500 units from its DG set, so efficiency was 2.5 units per litre. After cleaning filters and cutting no load running, it reached 2.9 units per litre.
Records and checks
- Record units generated from a meter, litres filled, load and run hours each month.
- Verify that the meter reading and diesel stock are taken at the same time as filling.
- The maintenance head investigates when efficiency drops by about a tenth below its usual level.
Common mistakes
- Using an estimate of units from run hours when the set was lightly loaded.
- Ignoring a gradual fall in units per litre until the next major repair.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →