Good pieces
Good pieces are the units produced that meet specification at inspection and can go to the next stage or the customer, excluding scrap and units needing rework.
What it means
Machines and operators make more pieces than they hand over. The count of good pieces is what earns money and goes into stock. Comparing it with total pieces made shows the quality loss. It feeds production reports, piece-rate pay and job costing, so it should come from inspected output and not from a machine counter alone.
Example
A press shop runs 3,000 stampings in a shift. The counter shows 3,000, but 120 are cracked and 80 with burrs go for rework. Good pieces are 2,800, and the shift report and the operator's incentive use 2,800.
Records and checks
- Record total produced, good, rework and scrap quantities by job, shift and machine.
- Verify that total produced equals good plus rework plus scrap, with no unexplained gap.
- The quality inspector confirms the good count; the supervisor signs the shift sheet.
Common mistakes
- Paying or reporting on the machine counter before inspection, so scrap gets rewarded.
- Adding reworked pieces back as good without a second inspection.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →