Goods dispatch note
A goods dispatch note is the document that records goods leaving the seller's premises, naming the items, quantities, recipient, date and carrier, and used by stores, accounts and the customer.
What it means
Businesses use this title for the same outbound record that others call a dispatch note. It supports stock deduction, invoicing and delivery tracking. For multi-item or multi-drop loads, it is the checklist the loader and driver follow. It is kept separate from the invoice because dispatch and billing may happen on different days.
Example
A tile dealer sends 240 boxes of floor tiles to three sites on one truck. The goods dispatch note lists the boxes for each site with its drop sequence. Each site signs against its line, and stores reduce stock by 240 boxes the same day.
Records and checks
- Record the note number, date, items, quantities, destination, vehicle and who loaded and checked the goods.
- Verify the loaded count against the order or pick list, and the stock deducted against the note.
- The storekeeper issues it, and the accounts team matches it with invoices.
Common mistakes
- Deducting stock before the goods are actually loaded, or after a long delay.
- Raising several notes for one load with no link between them.