HAZ

HAZ is short for heat affected zone, the area of base metal next to a weld that did not melt but had its properties changed by the heat of welding.

What it means

Metal near the weld heats and cools quickly, which can make it harder, more brittle or softer than the original material, depending on the alloy. The HAZ is often where cracks or failures begin in fatigue loading. Procedures control heat input and preheat to keep it small.

Example

A fabricator welds 25 mm high-strength steel plate for a crane component. The procedure calls for preheating to a set temperature and limiting heat input, because a fast-cooled, wide HAZ could become brittle and crack under repeated loading.

Records and checks

  • Record the welding process, heat input, preheat and interpass temperatures and the plate grade and thickness.
  • Verify that the welding follows the approved procedure and that hardness or inspection checks are done where specified.
  • The welding engineer sets the limits, and the inspector reviews the records for critical joints.

Common mistakes

  • Welding thick or high-strength plate cold, without the preheat the procedure calls for.
  • Repeated repair welding in the same spot, which enlarges the affected zone and weakens it further.