Heat affected zone
The heat affected zone is the band of base metal next to a weld or thermal cut that was not melted but whose structure and properties were changed by the heat.
What it means
Any process that heats metal locally, such as welding, plasma cutting or laser cutting, leaves such a zone. Within it the metal may harden, soften, grow coarse grains or lose corrosion resistance, depending on the alloy. Stainless steel, for instance, can lose corrosion resistance there if heat input is too high.
Example
A stainless tank maker welds 3 mm sheet. After welding, the discoloured band beside each seam is pickled and passivated, because that heat-tinted zone resists corrosion less than the untouched sheet.
Records and checks
- Record the process, heat input, travel speed, shielding gas, preheat and the material grade used.
- Verify the zone visually, and by hardness test or other methods where the specification requires it.
- The welder follows the procedure, and the inspector or third party checks critical joints.
Common mistakes
- Treating the heat tint as only a cosmetic problem on stainless steel items.
- Using slow travel speed or high current to make welding easier, which widens the zone.