lamp.
ResourcesPricingAbout

Hazard identification

Hazard identification is the systematic search of tasks, equipment, materials and places at work for anything that could cause injury, illness or damage, before it does.

What it means

It is the first step in managing risk. A hazard is the thing with the potential to harm: an unguarded belt, a wet floor, loose wiring, a heavy manual lift or a toxic solvent. People find them by walking the site, watching tasks and asking workers, who know the danger spots best.

Example

A walk through a small cold-rolling unit lists eight hazards, including an open drive chain, oil on the floor and a cracked ladder. The owner repairs the ladder at once and fits a chain guard within a week.

Records and checks

  • Record the area, the hazard, who could be harmed, existing controls, the new action, the owner and the due date.
  • Verify by re-walking the area that the controls are in place, and repeat the walk after any change.
  • The safety officer leads with supervisors and workers, and the owner reviews open items.

Common mistakes

  • Having the manager list hazards alone from the office, missing what operators know.
  • Noting the hazard but never recording an action, so the list becomes a record of known dangers.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →