Inspection lot
An inspection lot is a defined quantity of items, produced or received together, that is inspected as one group and given a single accept or reject decision.
What it means
Sampling needs a clear boundary. The lot may be one supplier delivery, one production batch or one day's output, as long as the items are made under similar conditions. The size of the lot decides the sample size. Mixing batches in one lot hides bad parts among good ones.
Example
A casting foundry sets one inspection lot as one pour of 240 pieces from a single melt. The inspector samples 20 for dimensions and finds three oversize. The whole pour is held for 100 per cent sorting, and the next pour, from a new melt, forms a separate lot.
Records and checks
- Record the lot number, source, quantity, date and the identity of the sample drawn.
- Verify that each lot is kept separate and labelled until the decision is made.
- The quality inspector assigns and tracks lots, and the stores head holds them.
Common mistakes
- Combining leftover pieces from two batches into one lot to save inspection effort.
- Releasing part of a lot before the decision is recorded.