Job card

A job card is the document that travels with a job through the shop, stating what to make, the operations, materials and instructions, and recording progress at each step.

What it means

It gives each operator the same information: the item, quantity, drawing, material, due date and sequence of operations. As work proceeds, people write down the quantity done, the time taken, rejections and sign-offs. When the job is complete, the card shows what was actually spent in time and material, which can be compared to what was planned. It is the shop-floor record of the order.

Example

At a Ludhiana tool room, job card 2284 is for 50 stainless steel bushes. It lists turning, drilling and grinding, with the drawing number, planned hours of 14, and an inspection stop after grinding. At the end, the card records 15.5 hours and 2 rejected pieces, with the operator's initials at each step.

Records and checks

  • Record the job number, item, quantity, operations, times, rejects and sign-offs at each step.
  • Verify that the quantity passed from one operation matches the quantity received by the next.
  • The supervisor issues and collects it; the planner and cost clerk use it to update progress and cost.

Common mistakes

  • Filling it in at the end of the day from memory, so times and rejections are guesses.
  • Losing the card or letting it separate from the batch, so the job loses its traceability.