kW

kW is the symbol for kilowatt, 1,000 watts, the unit shown on nameplates and meters for real power delivered or drawn at a moment.

What it means

You will see kW on motors, heaters, generator sets and solar panels. It should not be confused with kVA, which is apparent power and is higher or equal because it includes power that does no useful work. The ratio between them is the power factor. A kW reading also differs from kWh, which is energy over time. Care with the symbols avoids costly errors in equipment selection.

Example

A 100 kVA diesel generator has a power factor of 0.8, so it can deliver only 80 kW of real power. A workshop in Ambala that needs 90 kW of machines therefore needs a larger set.

Records and checks

  • Record the kW and kVA rating along with the power factor for each major equipment.
  • Verify the units used in quotations, since sellers mix kW, kVA and HP.
  • The electrical in charge checks the sizing before any purchase or approval.

Common mistakes

  • Buying a generator by kVA and assuming that is the kW available.
  • Writing "kw" or "KW" inconsistently in registers, which causes reading errors.