Manufacturing resource planning

Manufacturing resource planning is an approach that extends material requirements planning to cover capacity, shop-floor control, purchasing and finance, so one linked plan drives the factory.

What it means

Material planning tells you what to buy and make. Resource planning adds whether you have the machine and labour hours, whether the money is there, and links the sales forecast to the master schedule, shop orders and costs. The plans at each level agree with each other, so sales promises, production schedules and cash needs are consistent. It is often written as MRP II to tell it from the earlier material-only method.

Example

A Hosur auto-component firm gets a 20 per cent increase in a customer's schedule. Under resource planning, the change flows to material needs, the hours needed on the press line, and the extra purchases, which add about ₹14 lakh of stock. The owner sees that capacity and cash are both short, and arranges overtime and a supplier credit before accepting.

Records and checks

  • Record the sales forecast, master schedule, capacity and material plans, and the changes between versions.
  • Verify that the plans at each level are consistent and based on up-to-date stock and orders.
  • The planning head runs it; sales, production, purchasing and finance review it in one regular meeting.

Common mistakes

  • Updating the material plan but not the capacity plan, so the factory cannot do what the plan says.
  • Holding the plan on private spreadsheets, so departments work from different versions.