Maximum demand

Maximum demand is the highest average power, usually in kVA, drawn by a consumer over a set metering interval during a billing month.

What it means

The utility's meter records power in short blocks, such as 15 or 30 minutes, and keeps the highest figure for the month. That peak is used in demand charge and sometimes in penalty. It is not the same as connected load: it is how much was actually drawn at the worst moment. Starting many motors together or running heavy equipment at the same time pushes it up.

Example

A factory in Aurangabad finds that its maximum demand reaches 210 kVA each morning when the furnace, compressors and press are started within minutes. By staggering starts by ten minutes, it brings the peak down to 185 kVA.

Records and checks

  • Record the maximum demand from each bill and its date and time if the meter shows it.
  • Verify against contract demand to see any excess billed, and against the tariff rules.
  • The electrical head studies the peak time and the owner agrees a start up sequence.

Common mistakes

  • Looking at units consumed alone and missing that the peak decides part of the bill.
  • Not noting the date and time of each peak, which makes the cause impossible to trace.

Check the current rule on the official portal or with your CA before acting.