Mean time to repair
Mean time to repair is the average time needed to fix a failed machine and return it to service, found by dividing total repair time by the number of repairs.
What it means
It measures how quickly the maintenance team can restore equipment. A short figure indicates skilled technicians, available spares and good documentation. Depending on the firm's practice, it may start when the technician begins work or when the fault is reported; whichever is chosen must be used consistently. Waiting time for parts is often counted separately.
Example
A plant logs repairs on its boiler feed pump: 3 hours, 5 hours and 4 hours over a quarter. Mean time to repair is 4 hours, and ₹2,000 of lost production per hour means each fault costs about ₹8,000.
Records and checks
- Record fault reported, work started, work finished and restart times for each repair.
- Verify that every repair has both start and end times and that the definition has not changed.
- The technician logs the times; the maintenance supervisor reviews the average by machine monthly.
Common mistakes
- Mixing small adjustments and major overhauls in a single average.
- Recording times only when a repair is long, so the average looks worse than the reality.