lamp.
ResourcesPricingAbout

MFA

MFA is short for multi-factor authentication, a sign-in method that requires two or more different proofs of identity, such as a password and a one-time code from a phone.

What it means

A password alone can be guessed, phished or leaked. With MFA, a thief who has the password still needs the second factor, which is usually a code, an app approval or a hardware key.

Example

A fabric trader's accountant gets a phishing email and types her password into a fake page. Because the bank portal needs a code from her phone, the attacker cannot sign in, and the bank's alert about the failed attempt helps the owner spot the attempt.

Records and checks

  • Record which accounts have MFA switched on, the method used and the date it was enabled.
  • Verify that the owner, admins and finance users all use it, and that recovery options are controlled.
  • The IT lead enforces it and the owner checks it for email, banking and accounting accounts first.

Common mistakes

  • Sending codes to a phone number that several staff share or that belongs to a former employee.
  • Approving every prompt on the phone without checking who is signing in.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →