Microstop
A microstop is a brief, unplanned halt of a machine, often seconds or a couple of minutes, usually cleared by the operator without a repair call.
What it means
Typical microstops are a jammed part, a misfed sheet, a sensor trip or a blocked chute. Each looks too small to write down, yet dozens a shift can eat a large share of running time. Finding the pattern, such as one station causing most stops, often brings a cheap fix like a guide, a cleaning routine or a better sensor position.
Example
A packing machine stops about 40 times a shift for 45 seconds each, 30 minutes in all. At 60 packs a minute and ₹5 a pack, that is 1,800 packs, or ₹9,000 of output lost every shift with no breakdown logged.
Records and checks
- Record the count of stops, total time lost and the station or cause, using a tally or machine counter.
- Verify by watching the machine for an hour, since operators forget to log short stops.
- The operator tallies; the maintenance lead reviews the top causes each week.
Common mistakes
- Treating short stops as normal and never measuring them, so the loss is invisible in reports.
- Clearing jams faster instead of removing what causes them.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →