Mild steel
Mild steel is a low-carbon steel, usually under about 0.25 percent carbon, valued for being easy to cut, bend, machine and weld, and widely used in general fabrication.
What it means
Its low carbon content makes it tough and formable but softer than tool or alloy steels, and it rusts without paint or plating. Buyers usually specify it by a standard grade and by form such as plate, sheet, angle or round bar.
Example
A gate maker buys 2 tonnes of MS angle 40 x 40 x 5 and MS flat for a factory shed's gates. They are cut, welded and painted, and the supplier's invoice and mill test certificate are filed with the job.
Records and checks
- Record the grade, form and size, heat or batch number, supplier and quantity received.
- Verify the dimensions and weight at receipt and match the mill certificate to the heat number marked on the material.
- The store keeper receives it, and the quality inspector reviews certificates for jobs that need them.
Common mistakes
- Assuming all "MS" is the same grade, when strength and chemistry vary between suppliers.
- Storing it outdoors uncovered, so surface rust adds blasting and painting cost.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →