Milling
Milling is a machining process in which a rotating cutter with several teeth removes material from a workpiece that is fed past it, making flat faces, slots, pockets and shapes.
What it means
It is done on vertical or horizontal milling machines and on CNC machining centres. The cutter spins while the table moves the part, so many surfaces can be finished in one setup.
Example
A job shop machines 150 aluminium motor end covers. On a vertical machining centre, it faces the top, mills a 6 mm deep pocket and cuts four slots in one setup, taking about 11 minutes a piece, then inspects the pocket depth.
Records and checks
- Record the cutter, speeds and feeds, fixture, program revision, material and cycle time per piece.
- Verify the first piece for flatness, pocket depth and hole positions before running the lot.
- The operator checks during the run, and the inspector approves the first piece and final sample.
Common mistakes
- Using a worn cutter beyond its life, which leaves poor finish and drifting dimensions.
- Weak part holding, which lets the piece move and ruins both the part and the cutter.