Minimum viable product
A minimum viable product is the simplest working version of a product that real customers can use, built to learn whether they want it before heavy investment.
What it means
The idea is to test the main assumption cheaply. You build only what is needed for a customer to get the core benefit, put it in a few hands and watch what happens. Their response shows what to keep, change or drop. It is not a poor-quality product: what it does must work well enough to be judged, even if features are few and finishing is basic.
Example
A Madurai entrepreneur wants to sell ready-to-cook millet dosa mix. Instead of investing ₹6 lakh in packing machinery, she hand-packs 400 packets of one flavour in a rented kitchen and sells them through ten local shops. Repeat purchases within a month tell her whether to go further.
Records and checks
- Record the assumption being tested, the version built, the customers reached and the cost.
- Verify the result with a clear measure fixed beforehand, such as repeat orders or enquiries.
- The owner decides whether to scale, change or stop; a second person checks the numbers honestly.
Common mistakes
- Adding many features before any customer has used it, so the test becomes slow and costly.
- Setting no success measure in advance, then reading any response as encouraging.