Mistake proofing
Mistake proofing is the design of a process, tool or fixture so that an error is impossible or is detected immediately, without relying on the worker's attention.
What it means
Telling people to be more careful does not remove errors. Mistake proofing changes the setup: a fixture that only accepts the part in the right orientation, a counter that stops the machine if a hole is missing, a tray that holds exactly the right number of screws. The Japanese term is poka-yoke.
Example
An assembly line was fitting the wrong spring about once a week. The supervisor changed the bins so the two springs sit in different coloured trays, and added a nozzle that stops the press unless a lighter spring is present. Wrong-spring complaints fell to zero over the next quarter.
Records and checks
- Record the error being prevented, the device used and the date it was fitted.
- Verify that the device is tested with a deliberately wrong part at each shift start.
- The supervisor owns the check, and maintenance keeps the devices working.
Common mistakes
- Bypassing the device when it slows the line and never reporting it.
- Responding to errors with a notice board warning instead of a design change.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →