Mould temperature
Mould temperature is the temperature of the mould's cavity surfaces, controlled by water or oil circulating through channels, which affects how the plastic cools and sets.
What it means
A hotter mould lets plastic flow and gives a glossier finish with less internal stress, but it cools more slowly and lengthens the cycle. A colder mould speeds cooling but can give flow lines, weak welds and warped parts. Each material has a recommended range. A temperature controller keeps the mould steady, and blocked or uneven channels cause hot spots and uneven parts.
Example
A glossy polycarbonate panel shows flow lines at a mould temperature of 60 °C. The supplier's range is 80 to 100 °C. The setter raises the controller to 85 °C, the flow lines clear and the cooling time is lengthened by 3 seconds to keep the part flat.
Records and checks
- Record the controller set point, the actual mould reading, the coolant flow and the date.
- Verify with a surface probe that the actual temperature matches the controller and is the same across the two halves.
- The setter sets it, the operator monitors it, and maintenance checks the channels and hoses for scale and leaks.
Common mistakes
- Trusting the controller display without measuring the real surface temperature.
- Using one temperature for all jobs, whatever the material.