Moving average cost
Moving average cost is a valuation method where the unit cost of an item is recalculated after each purchase by dividing total stock value by total quantity on hand.
What it means
Each time new stock arrives, its value is added to the existing value and the total is divided by the new total quantity. Issues are then priced at that running average until the next purchase. The method smooths price swings, which suits items bought often at changing rates, such as chemicals or metals.
Example
A store holds 200 kg of copper wire at ₹700 (₹1,40,000) and buys 100 kg at ₹760 (₹76,000). Value is ₹2,16,000 for 300 kg, so the average is ₹720 per kg, and 50 kg issued to a job costs ₹36,000.
Records and checks
- Record quantity, rate and value of every receipt, plus the average after it.
- Verify that returns, rejected material and free-of-cost items are not distorting the average.
- The accountant recomputes a few items each month and compares them with the books.
Common mistakes
- Issuing stock before the latest purchase is entered, so the job is costed at a stale average.
- Entering freight separately, which leaves the average below the true landed cost.