Multilevel BOM
A multilevel BOM is a bill of materials that shows a finished product, its sub-assemblies and each sub-assembly's own components in layers, down to raw materials.
What it means
A simple list shows only the direct parts of a product. A multilevel one shows that a sub-assembly is itself made from parts, which may in turn be made from others. It lets planning explode a demand for the finished product down through every level, working out what to make at each stage and what to buy. It also lets costing roll up material cost from the bottom to the top.
Example
A Chennai manufacturer of gensets has level 0 as the genset, level 1 as the engine, alternator and control panel, and level 2 under the panel as the breaker, meter and wiring harness. For 10 gensets, the plan shows 10 panels, hence 10 breakers, 10 meters and 10 harnesses to be ready before the panel is assembled.
Records and checks
- Record the parent and child at each level, quantities, units and the effective revision.
- Verify there is no loop in which an item is its own component, and that quantities are per one unit.
- The engineering head owns it; planning and costing confirm they roll up the same structure.
Common mistakes
- Entering a sub-assembly's parts twice, once at its own level and again on the parent.
- Not making the stock of sub-assemblies visible, so planning orders them when spares already exist.