lamp.
ResourcesPricingAbout

Near miss

A near miss is an unplanned event that had the potential to cause injury, illness or damage, but did not, by luck or quick action.

What it means

For every serious accident there are many near misses that gave a warning. A falling pallet that lands beside a worker, a spill that someone slips on without falling, a wire found live before touching: each shows a weakness in the system.

Example

At a food distributor in Hyderabad, a carton falls from the third rack and lands half a metre from a loader. The loader reports it the same day, and the manager finds three racks overloaded beyond their marked limit and fixes the loading rule.

Records and checks

  • Record what happened, where, what could have happened and who reported it.
  • Verify the cause by looking at the spot, and check whether a similar event happened before.
  • The safety committee reviews the list weekly and tracks the action for each repeat location.

Common mistakes

  • Scolding the person who reports, so reports dry up.
  • Collecting reports but never acting, which teaches staff that reporting is pointless.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →