Operating model
An operating model describes how a business is organised to deliver what it sells, covering its processes, people, locations, tools and the way work and decisions flow between them.
What it means
The business model says how the firm earns; the operating model says how it runs. It answers practical questions: do you make in-house or outsource, hold stock centrally or at each branch, sell through your own staff or agents, and who owns each process. When a firm grows, the old way of running often stops working,.
Example
A furniture maker outsources cutting to a local workshop, assembles and finishes in its own unit, and sells through three showrooms with one central warehouse. Moving finishing to a second unit would change the operating model.
Records and checks
- Record: main processes, which are in-house or outsourced, locations, owners and handover points.
- Verify: that the way the work really flows matches the written model and that every step has an owner.
- Checked by: the owner reviews it before expansion, new locations or a big change in volume.
Common mistakes
- Letting the model grow by accident, so that nobody can say who owns a step.
- Copying a larger firm's structure without the volume to justify it.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →