Pilot production

Pilot production is a limited manufacturing phase using the planned tools, process and people to prove that the product can be made consistently before full-scale output.

What it means

It sits between prototype and regular production. A prototype may be built by one skilled person with improvised tools; pilot production uses the real fixtures, real operators and real materials. Problems that were invisible on a single piece appear, such as slow cycle times, fit issues, inspection gaps or supplier delays. The batch is usually sold, used for customer approval, or kept for testing, and its findings are fed back before the volume ramps up.

Example

A Kolkata electrical accessories firm plans a new modular switch. After tooling is ready, it runs 1,000 pieces on the actual moulding and assembly line over two shifts. It finds that one clip needs 14 seconds against a planned 9, and rejection runs at 4 per cent. The fixture is revised before the full order.

Records and checks

  • Record the quantity, process settings, cycle times, rejection counts and issues found.
  • Verify that pilot parts meet drawing and test requirements, measured by the same methods used later.
  • The production head runs it; quality signs the results before the release to full volume.

Common mistakes

  • Using the best operators and extra supervision, so the results do not reflect normal running.
  • Moving to full volume without closing the issues found, hoping they will resolve themselves.