Pipe schedule

Pipe schedule is a standard designation, such as Sch 40 or Sch 80, which together with the nominal pipe size sets a pipe's wall thickness.

What it means

Pipe outside diameter is fixed for each nominal size, so a higher schedule means a thicker wall and a smaller bore. Thicker walls carry more pressure. The same schedule number gives a different wall thickness for different nominal sizes, so you need both size and schedule to know the dimensions.

Example

A piping contractor quotes for 2 inch nominal pipe. Sch 40 has a wall of about 3.9 mm, and Sch 80 about 5.5 mm. The Sch 80 pipe weighs more per metre, so with price charged by weight, the line costs noticeably more.

Records and checks

  • Record the nominal size, schedule, material grade, seamless or welded type, length and heat number.
  • Verify wall thickness at receipt with an ultrasonic gauge or calliper and compare with the standard table.
  • The design engineer specifies it, and the store inspector checks delivery against the purchase order.

Common mistakes

  • Ordering by nominal size alone, so a lighter schedule is shipped.
  • Assuming schedule number equals wall thickness in millimetres.