Pilot run
A pilot run is a single trial run of a new or changed product or process, on the intended equipment, to confirm settings, quality and timing before regular production.
What it means
It is more narrow than a whole pilot phase: one run, one setup, with a purpose. You use it when a new tool arrives, a material changes, or a customer wants proof before a big order. People watch and measure much more closely than usual, adjusting settings and noting what was needed to get good parts. The final settings found become the standard setup sheet.
Example
A Vapi chemical unit changes its solvent supplier. It runs one 500-litre pilot batch of a coating, recording temperature, mixing time and viscosity every 15 minutes. Viscosity drifts 8 per cent at the end, so the team adds a 10-minute extra mixing step to the batch instructions.
Records and checks
- Record the settings used, material lots, measurements over time and the final accepted parameters.
- Verify that the output was tested against specification before the new settings are approved.
- The production supervisor runs it; the quality person approves the results.
Common mistakes
- Treating one good run as proof, without a second run to show the result repeats.
- Not writing down the adjustments made on the day, so the next shift cannot reproduce them.