Plan versus actual
Plan versus actual is a comparison of the planned quantity, cost, time or revenue with the actual result for the same period, showing the gap and where it arose.
What it means
The plan may be a production schedule, a budget or a sales target. The value lies in explaining the gap, not just stating it. Regular reviews catch problems while they can still be corrected.
Example
A bakery plans 6,000 loaves a week and makes 5,400. The gap is 600 loaves, or 10 percent. The record shows two oven breakdowns cost 400 loaves and a flour delay cost 200, so the owner books a service contract and a second flour supplier.
Records and checks
- Record the plan figure, the actual figure, the gap and the reason for each significant difference.
- Verify that plan and actual are measured the same way and for the same period.
- The supervisor reports it weekly, and the owner reviews the reasons and assigns an action.
Common mistakes
- Revising the plan after the period to match the actual, so there is never a gap.
- Reporting the gap without a reason, so the same shortfall repeats next period.