Planned downtime
Planned downtime is time a machine or plant is deliberately stopped in advance for maintenance, tool changes, cleaning, breaks or setups, as opposed to an unexpected breakdown.
What it means
Every production schedule has stoppages the owner chooses. Preventive maintenance, die changes, scheduled cleaning, power shutdowns for electrical work and shift breaks all belong here. Because they are agreed beforehand, the plan accounts for them and they are kept apart from unplanned stops. Splitting the two shows whether a machine is failing or simply being looked after.
Example
A plastics unit shuts its moulding machine for 3 hours every Sunday for lubrication and filter cleaning. A hose bursting on Wednesday and stopping the machine for 2 hours is unplanned downtime and is logged separately.
Records and checks
- Record the date, start and end time, reason and the person who approved each planned stop.
- Verify that the work actually done matches the maintenance schedule before the machine restarts.
- The maintenance in-charge signs off the completion, and the production manager checks it against the plan.
Common mistakes
- Calling a breakdown "planned" after the event, which hides how unreliable a machine is.
- Letting planned stops overrun with no note, so lost hours are never explained.