Planned maintenance
Planned maintenance is maintenance work that is decided, scheduled and prepared in advance, with the job, people, parts and downtime time slot agreed beforehand.
What it means
The term covers more than calendar servicing. Any job whose scope is known ahead and booked into the plan counts, including repairs found at an inspection and scheduled for next week. Planning allows spares to be ready and the work to be done during a stoppage, so production is disturbed less. A common target is for most of the maintenance hours to be planned, not emergency.
Example
At a weekly check, a technician sees a cracked coupling guard. The repair is booked for Sunday, the guard is pulled from stores and the job takes 40 minutes with no loss of output.
Records and checks
- Record the scheduled date, job scope, parts reserved, assigned technician and the actual completion.
- Verify the share of planned versus emergency hours each month.
- The maintenance supervisor plans and reports the share; the production head confirms stoppage slots.
Common mistakes
- Planning the job but not reserving the spare, so the slot is lost.
- Calling every job planned even when it was done on the day it was found.