Plastic scrap
Plastic scrap is waste plastic produced in processing, including rejected parts, runners, purge, start-up material and trimmings, which may be reground and reused or sold.
What it means
Every moulding or extrusion run produces some scrap. Clean runners and trimmings of a known grade can often be ground and mixed back, within limits. Rejected parts with contaminants, mixed grades or colour problems may not be reusable and are sold as low-value scrap. Because resin is the largest cost, scrap rate is a major control figure and should be tracked by cause.
Example
A moulder uses 10,000 kg of resin in a month. Scrap is 650 kg, a rate of 6.5 percent. Of this, 400 kg is clean runner that is reground and reused, 150 kg is start-up purge that is sold and 100 kg is rejected parts with black specks, which is traced to a dirty hopper.
Records and checks
- Record scrap weight by cause, material grade, machine and shift, and whether it was reused or sold.
- Verify that material issued equals good parts plus scrap plus the stock movement, so nothing is unaccounted for.
- The operator weighs and logs, the stores in-charge reconciles monthly, and the owner reviews the causes of the largest items.
Common mistakes
- Mixing different grades or colours of scrap in one bin, so none of it can be reused.
- Not weighing scrap, and so never seeing how much resin is lost.