Press brake

A press brake is a machine that bends sheet and plate metal into angles, channels and boxes by pressing it between an upper punch and a lower V-die.

What it means

The operator or CNC program sets the bend angle, the back gauge position and the tool pair. Tonnage and bed length limit the thickness and length of material that can be bent.

Example

A cabinet maker bends 2 mm sheet for 300 control panel doors on a 100 tonne press brake. Using a 16 mm V-die and a 90 degree punch, the operator makes four bends per door and checks the angle with a protractor on the first piece.

Records and checks

  • Record the material, thickness, tool pair, bend sequence, angle correction and program number.
  • Verify the first bent piece for angle and flange length before the full lot is bent.
  • The operator checks during the run, and the supervisor approves the first piece.

Common mistakes

  • Bending too close to a hole or edge, which distorts the feature.
  • Using a die opening that is wrong for the thickness, which cracks the part or makes the radius inconsistent.